Three-story self-storage facility planned for Tchoupitoulas at Upperline

Print More

A rendering by architect Jared Ducote of the proposed storage facility on Tchoupitoulas. (via City of New Orleans)

A three-story self-storage facility is planned for construction on Tchoupitoulas Street at the corner of Upperline Street, and is scheduled for a hearing before city officials early next month.

A rendering of the proposed storage facility along Tchoupitoulas Street. (via City of New Orleans)

The building at 4866 Tchoupitoulas (the current site of Guillot’s Sanitary Supplies) will be built by developer Gordon H. Kolb, according to documents filed with the city. The project will take up much of the block bounded by Tchoupitoulas, Upperline, Lyons and South Front Street at the rear, wrapping around a cluster of homes at the Tchoupitoulas/Lyons corner, according to design drawings included in the application.

The site plan for the self-storage project. (via City of New Orleans)

The project includes enough space for the parking spaces required by the city, and developers do not anticipate the parking lot to be filled, according to information they provided neighbors.

The property is zoned for medium-intensity mixed use development, and a self-storage warehouse is a conditional use in the zoning, which means it will require City Council approval.

An initial hearing on the project is scheduled before the City Planning Commission on Tuesday, Jan. 9.

Leave a Reply

Your email address will not be published. Required fields are marked *